New-Build Luxury Spa Installation | 2024 – Present
Project Overview
The Balmoral Hotel is one of the UK’s most prestigious luxury hotels, renowned for its iconic architecture, exceptional hospitality, and world-class guest experience. As part of the hotel’s continued investment in premium wellness facilities, a new Irene Forte Spa was commissioned to create a luxurious destination focused on health, relaxation, and wellbeing.

Appointed to deliver the full mechanical installation package, our team has been responsible for providing the essential infrastructure that supports the operation of this high-end spa environment. From initial first-fix works through to final commissioning, the project showcases our expertise in delivering complex mechanical services within luxury hospitality settings.
Scope of Works
Our appointment encompasses the complete mechanical installation for the new spa facility, including domestic water, plumbing, heating, cooling, and ventilation systems throughout the development.
Key elements of the project include:
- New domestic water services installed from the main boiler room
- Complete plumbing installation throughout the spa
- Mechanical services for:
- 7 luxury treatment rooms
- Large men’s and women’s changing facilities
- Shower areas
- Sanitary systems
- Reception and guest welcome areas
The HVAC package includes:
- Installation of 24 Fan Coil Units (FCUs)
- New chilled water systems
- New heating systems
- Full mechanical integration from the roof plant and boiler room through to all spa facilities
The project has required detailed coordination between multiple disciplines to ensure seamless delivery and system performance across the entire spa environment.
Delivering a Luxury Wellness Destination
The creation of a premium spa within a flagship hotel demands exceptional attention to detail. Every aspect of the mechanical installation has been carefully planned and executed to support the comfort, wellbeing, and experience of future guests.

From temperature-controlled treatment rooms to high-performance shower and changing facilities, the mechanical systems have been designed to deliver reliability, efficiency, and comfort while remaining discreetly integrated within the spa’s luxury interior design.
Working closely with the wider project team, we have ensured that all services align with the architectural vision of the Irene Forte Spa brand while meeting the operational requirements of a world-class hospitality venue.
Comprehensive Mechanical Expertise
A defining feature of this project has been the delivery of a complete mechanical package from first fix through to completion. Our team has overseen every stage of the installation process, ensuring all plumbing, heating, cooling, and ventilation systems are fully coordinated and integrated.

The installation of new domestic water services from the boiler room, combined with the integration of roof plant equipment, chilled water infrastructure, and heating systems, has required a high level of technical expertise and project management. Careful planning has been essential to ensure all systems operate efficiently as a fully connected network.
The Outcome
As the project progresses towards completion, the new Irene Forte Spa at The Balmoral Hotel is set to become one of Scotland’s premier luxury wellness destinations.